.

Videos

Introduction

Things you need

Setting up the BBraun Machine

Lining the Machine (Red line)

Lining the Machine (Blue line)

Connecting the Saline line to BAG

Connecting Concentrate and Bicarbonate

Priming

Connecting the Couplings

Recirculation

Passing the Safety Checks